Cycling Strategies

Maintenance Cycle Strategy

Saturday, June 30th, 2007

Maintenance: recommended prohormone cycle*
17aa prosteroid products (methyls) should run for periods of 2 to 4 weeks while non-methylated prohormones can be run between 4 and 6 weeks. Both should be front-end loaded and tapered toward the end of the cycle:

Week 1:  3 caps per day of dry prohormone
Week 2:  3 caps per day of […]

Cutting Shredding Cycle Strategy

Saturday, June 30th, 2007

Cutting /Shredding recommended cycle - 17aa prosteroid products (methyls) should run for periods of 2 to 4 weeks while non-methylated prohormones can be run between 4 and 6 weeks. Both should be front-end loaded and tapered toward the end of the cycle:
Week #1: 2 caps per day of dry prohormone
Week #2: 1 cap per day […]

Bulking Cycle Strategy

Saturday, June 30th, 2007

17aa prosteroid products (methyls) should run for periods of 2 to 4 weeks while non-methylated prohormones can be run between 4 and 6 weeks. Both should be front-end loaded and tapered toward the end of the cycle:
Week #1: 3 caps per day of dry prohormone and 3 caps per day of wet, stackable prohormone
Week #2: […]